REDSTONE ENGINEERING APPRENTICESHIP

REDSTONE
APPRENTICESHIP OPPORTUNITY
Redstone CSP 6 Power Project located 25 km East of Postmasburg. The newly developed project will generate power by using Concentrated Solar Power ‘CSP” tower technology in South Africa The Redstone CSP project is a Greenfield Independent Power Project (IPP) developed as part of South Africa’s renewable IPP program The project will be developed on a BOO (build, own, operate) with a total power generating capacity of 100 MW net power output The project will be equipped with the largest thermal storage size ever adopted in South Africa and is among the most efficient solar plants in the world operating in this class of capacity and technology yielding a record high generation in excess of 480 GW11,year to support the power gnd of South Africa,

Minimum Qualifications and Requirements:

• Applicant must reside in Zone 1 (Kgatelopele and Tsantsabane( and be a South African citizen

• Minimum of Grade 12 (passed Maths and Science)

• Or N2,NCV 4 with 4 subjects passed including Trade Theory.

• Unemployed youth (Age 18-35 years).

Programme Requirements:
•Electrician

• Fitting

• Control and Instrumentation (C&I)

• Welding

• Diesel Petrol Mechanic

How to apply:
• CV

• Motivation letter

• ID copy

• Statement of result for N2NCV

• Matric certificate

The value of the apprenticeship includes: • Full registration and tuition fees

• Full Residence and Meals

• Traveling to school and home

• Books

• Stipend Please submit your CV -and supporting documents to ed.redstone@acwapower.com

Closing Date: 31 January 2025 if you do not hear from us by the 21 of February 2025, kindly consider your application unsuccessful.

Climate f. Bond Certified
DO NOT MISS OUT ON THIS OPPORTUNITY

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!